Mechanical

Print
Press Enter to show all options, press Tab go to next option

For mechanical work in all occupancies.

Permit Fees

Issuance fee, each permit

Non-Residential

$25

Residential

$15
For the installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance.

Up to and including 100,000 BTU

$22

More than 100,000 BTU to and including 500,000 BTU

$32

More than 500,000 BTU to and including 1,000,000 BTU

$44

More than 1,000,000 BTU to and including 2,000,000 BTU

$65

More than 2,000,000 BTU

$109
For each evaporative cooler other than portable type (commercial) $14
For each ventilating fan connected to a single duct (commercial) $9
For each ventilation system which is not a portion of any heating or air conditioning system authorized by a permit (commercial) $17
For the installation of each hood which is served by mechanical exhaust, including the fans and ducts attached thereto $22
For the installation or relocation of each domestic type incinerator $22
For the installation or relocation of each domestic type incinerator $76
For the installation or relocation of each cooling coil, reheat coil or electric strip heater

Note: This fee for cooling coils, reheat coils, and electric strip heaters shall not apply to an air handling unit which is a portion of a factory assembled appliance, comfort cooling unit, evaporative cooler, or absorption unit for which a permit is required elsewhere in the Code.

$9
For each appliance regulated by the Code, but not classed in other appliance categories or for which no other fee is listed in the Code $14
Incidental gas piping $7

For the installation or relocation of each floor furnace including vent

$22
For the installation or relocation of each suspended heater, recessed wall heater or floor-mounted unit heater including vents $22
For the installation, relocation, or replacement of each appliance vent installed and not included in an appliance permit $11
For each air handling unit (cubic feet per minute (CFM):

2,000 CFM or less

$11

2,001 to 10,000 CFM

$22

More than 10,000 CFM

$44

For the installation or relocation of each boiler or compressor or absorption system:

To and including 5 horsepower or to and including 100,000 BTU (including vent)

$32

Over 5 horsepower to and including 15 horsepower, or over 100,000 BTU to and including 500,000 BTU (including vent)

$44

Over 15 horsepower to and including 30 horsepower, or over 500,000 BTU to and including 1,000,000 BTU (including vent)

$65

Over 30 horsepower to and including 50 horsepower, or over 1,000,000 BTU to and including 2,000,000 BTU (including vent)

$86

Over 50 horsepower, or over 2,000,000 BTU (including vent)

$109

Plan Check Fee

New Construction 50 percent x Permit Fee

Revisions (plus permit fees for items not previous approved

50 percent x Permit Fee

Alterations (plus permit fees for items not previously approved)

50 percent x Permit Fee

Additions (plus permit fees for items not previously approved)

50 percent x Permit Fee
Alterations or revisions to approved plans

Per Hour

Hourly rate
Applicable Division

Minimum Charge

One-half hour

Special Services

Reinspection each visit $50
Investigation

Record Search Only

$22

Complete

$140

More Service Fees